Estimation

 Home 

1. What is the expected out turn of cement concrete 1 : 2 : 4 per mason per day is?
     m3


     m^3
... Answer is B) 5.0 m3

 

2. Damp Proof Course is measure in__________




... Answer is C)
Since thickness of DPC is small.

 

3. Plinth area of a building will not include which of the following?
     
     


... Answer is A)
Courtyards are also excluded in plinth area.

 

4. What is the useful or livable area of a building known?



     
... Answer is A)
Carpet area.

 

5. Initial lead for earthwork in foundation trench is_________




... Answer is C)
Initial lead is 50m and initial lift is 1.5m.

 

6. When filling work in trech is done, the thickness of each layer of fill should not be more than




... Answer is B)20cm

 

7. The excavation exceeding 1.5m width and 10sqm in plan area and depth not exceeding 30cm can be called as____________


     

... Answer is A)
Surface excavation.

 

8.In which of the following cases measurments are made in sqm?
     



... Answer isB)
Sqm for Surface dressing upto 15cm and surface excavation upto 30cm .

 

9. Budget coasting for construction projesct should be due 




... Answer is B)
in planning stage.

 

10. Material shall be issued on the basis of which of the following




... Answer is D)
Index form.