Setback for Wells and Rainwater harvesting.
- The set back from any street shall be as that required for a building.
- There shall be minimum 1.20 metres set back from other boundaries.
- The well may be located within or abutting or away from the building in the plot
The components of workable groundwater recharging arrangements include:
- Roof gutters
- Down pipe and first flush pipe arrangement
- Filter unit and
- Storage tank with provisions for drawing water and spill over
No leech pit, sock pit, refuse pit, earth closet or septic tank shall be allowed or made
within a distance of 7.5 metres radius from any existing well used for supply of
water for human consumption or domestic purpose or within 1.2 m distance from the
plot boundaries.
Wall and surrounding.— The well shall be protected with brick wall with minimum 1
metre height.
The minimum capacity of the rainwater storage tank
Group A1 ,A2 ,F,J | 25 litres/sq.metre of Covered area |
Group B,C,D,E, G1 ,G2 | 50 litres/sq.metre of Covered area |
KMBR basic important definitions KMBR2019 vs NBC 2016 Groups Well and Rainwater harvesting Colour Schemes in KMBR 2019
No comments:
Post a Comment